Planned Maintenance

Create time or meter based PMs, and assign to assets.

  • Access & Configure the Maintenance Planner

    1. Login into the web app using your credentials. 2. Click on the XB Planner icon.  3. The XB Planner will open in a new browser window.   4. For first time users of the planner, the planner needs to ...

  • Add More Bays to the Maintenance Planner

    1. Open the XB Planner  2. Select workshop loading.  3. Select the VMU required and the bays will displayed on the Left hane column e.g Z VMU and Bays Z1 and Z 2.   4. To add more bays go to assetmind...

  • Create a Time-Based Planned Event

    Background This procedure outlines the steps necessary to create a planned event template. Planned events are time or meter-based events such as 8-week inspections, annual services, or 100KM timing be...

  • Create a Meter-Based Planned Event

    Background This procedure outlines the steps necessary to create a planned event template. Planned events are time or meter-based events such as 8-week inspections, annual services, or 100KM timing be...

  • Add a Time & Meter Based PM

    Background This procedure outlines the steps necessary to create a planned event template. Planned events are time or meter-based events such as 8-week inspections, annual services, or 100KM timing be...

  • Verify the Planned Maintenance Schedule for an Asset

    Prerequisites before using this procedure: Create the asset record in Assetminder Create the time or time & meter-based planned event template Assign the planned event to the asset Procedure 1  Click ...