Planned Maintenance

Create time or meter based PMs, and assign to assets.

  • Access & Configure the Maintenance Planner

    1. Login into the web app using your credentials. 2. Click on the XB Planner icon.  3. The XB Planner will open in a new browser window.   4. For first time users of the planner, the planner needs to ...

  • Create a Time-Based Planned Event

    Background This procedure outlines the steps necessary to create a planned event template. Planned events are time or meter-based events such as 8-week inspections, annual services, or 100KM timing be...

  • Create a Meter-Based Planned Event

    Background This procedure outlines the steps necessary to create a planned event template. Planned events are time or meter-based events such as 8-week inspections, annual services, or 100KM timing be...

  • Add a Time & Meter Based PM

    Background This procedure outlines the steps necessary to create a planned event template. Planned events are time or meter-based events such as 8-week inspections, annual services, or 100KM timing be...

  • Verify the Planned Maintenance Schedule for an Asset

    Prerequisites before using this procedure: Create the asset record in Assetminder Create the time or time & meter-based planned event template Assign the planned event to the asset Procedure 1  Click ...